Close Menu
Monster Commercial
    What's Hot

    Submetering: Real Energy Savings and Reduced Costs

    March 21, 2024

    Green Building Materials: A Green Building Starts with a Green Shell

    February 15, 2024

    Siskinds Chooses Manufactured Construction by DIRTT for Its New Ontario Office

    February 8, 2024
    Facebook X (Twitter) Instagram
    « MONSTER COMMERCIAL
    Monster Commercial
    • Interior Design
    • Workplace Wellness
    • Sustainability
    • Maintenance
    • Construction
    • Building Tech
    « MONSTER COMMERCIAL
    Monster Commercial
    CRE Digest Home | Benefits of Virtual Design and Construction
    Interior Design

    Benefits of Virtual Design and Construction

    By Monster TeamAugust 5, 2019
    Facebook Twitter LinkedIn
    Share
    Facebook Twitter LinkedIn

    EllisDon now deploys a VDC Coordinator to each of our construction projects to setup and manage the 3D integration of Construction models provided by all parties. We bring years of experience to the table; having implemented VDC, start to finish, on every type of project from new building construction, highway service centers to billion dollar hospitals & hydroelectric generating stations.

    Example projects where VDC has been employed in our projects:

    University of Waterloo Engineering VII Building, Waterloo, Ontario

    The Engineering Building VII is a 235,000 square foot, seven-storey building for the University of Waterloo Engineering Department. The site area around the new build (and inside the existing Engineering V building which it attaches to) must be kept operational at all times due to university classes being held at all times during the year. The building’s new systems are tied into the existing building while also keeping the current users operational. At the onset of the project, our VDC team received architectural and structural 3D Revit models from the consultant, which enabled us to consolidate both models and undergo clash detection processes. Design issues were then resolved at the first instant which allowed for the effective mitigation of major potential conflicts on site.

    MaRS Discovery District, Fit-Out Project, Toronto, Ontario

    This building is located on the corner of College Street and University Avenue in Toronto’s Discovery District. The fit-out project was meant to coordinate the complex logistics of the installation of complex mechanical systems. Since the building was being occupied on other floors during construction, which was also on an extremely strict schedule, all floors were coordinated prior to construction. Prefabrication was crucial due to the complexity and uniqueness of the systems, as well due to the aggressive schedule

    707 Fifth Project, Calgary, Alberta

    Construction Management Project

    Our VDC team produced 3D conceptualizations to aid in the proper visualization of the final completion of this project. The project is 30 levels tall, 550,000 square feet in area, and oval shaped in a plan view. The project included extensive cladding of the building on a complex design schedule. All trades actively participated in weekly 3D coordination meetings to resolve design issues as well as interferences between systems. These trades modelled their systems in a level of detail that permitted prefabrication processes. A BIM coordinator was present on site to facilitate the implementation and management of BIM on the project.

    Share. Facebook Twitter LinkedIn
    Monster Team
    • Website

    Our knowledgeable team will keep you up to date with all the latest news from the CRE industry.

    Related Posts

    Siskinds Chooses Manufactured Construction by DIRTT for Its New Ontario Office

    February 8, 2024

    6 Benefits of Pre-Fab Construction For Your Building or Office Space

    February 1, 2023

    CES 2023: Tech for a Safer, Greener Hybrid Workplace

    January 17, 2023

    Comments are closed.

    Our Picks

    Parkland Leads the Charge in Calgary with EV Charging Stations

    January 19, 2023

    CES 2023: Tech for a Safer, Greener Hybrid Workplace

    January 17, 2023

    GSK Canada’s New Toronto Office Emphasizes Environmental Wellness

    January 11, 2023

    Green Retrofits and Labor Crunch: How It Could Affect Your Next Project

    December 20, 2022
    Monster Commercial
    Facebook X (Twitter) LinkedIn
    • Monster Commercial
    • About Us
    • Submit Articles
    • Contact Us
    • Pricing
    © 2025 Monster Commercial, CRL Network Media Inc. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.